CDM Smith Wadsworth , OH 44282
Posted 2 months ago
Job Description
The Construction Scheduler 2 is responsible for creating and revising preliminary master schedules detailing the sequence of all work to be performed. The Construction Scheduler 2 shall maintain the master schedule for each project and identify and record the impact of work performed and not performed as scheduled. Evaluate actual construction progress and provide regular schedule updates.
Primary Duties and Responsibilities
Assist Project Managers in creating short-term schedules, monitor such schedules to determine impact on master schedule, and help in formulating actions to correct scheduling problems
Coordinate with parallel activities within the firm including Engineering disciplines and office administrative functions
Contribute to the development of working schedules which sufficiently illustrate the sequence of work activities and contract time
Provide information as needed on the content, modification, or presentation of project schedule
Incorporate resource and/or cost loading data into schedules as required
Appraisal of project cost and schedule performance for all assigned projects
Status, update and report for all project activities
Integrate Subcontractor's schedules
Report and analyze schedule variances against baselines • Appraise contract progress relative to the schedule and report results to Project Manager
Review, upgrade as necessary, and approve the Subcontractor's schedule control plan
Ensure the Subcontractors' schedule and cost forecast are in alignment
Track and analyze progress variances against baselines
Raise flags, take recovery actions and follow up when adverse progress trends are identified
Review and endorse progress report by the Subcontractor
Track committed and actual, reconcile actual with estimated cost, develop cost forecast, analyze variations against baselines
Review and integrate with Subcontractors cost reports and expenditures
Employment Type
Regular
Minimum Qualifications
Three (3) or more years of relevant experience with an Associate degree or higher, or
Five (5) or more years of experience with a high school diploma or equivalent
The Associate degree or higher must be in Construction Management, Engineering, or similar technical field.
Preferred Qualifications
P6 experience
Experience in the heavy industrial industry
CDM Smith