ITS CEI Project Administrator

Metric Engineering Orlando , FL 32746

Posted Yesterday

We are seeking aCEI Project Administratorto support ourITS CEI team in Central Florida. Experience as a Project Administrator for the Central Florida Expressway Authority (CFX) and/or the Florida Department of Transportation (FDOT) is highly desirable. Experience with Intelligent Transportation Systems (ITS) is preferred but not required. Ten (10) years of construction inspection experience preferred. A college degree in Civil Engineering, Construction Management or a related field is preferred and can be substituted for experience. A licensed Professional Engineer with 5 years of experience as a Contract Support Specialist and/or Senior Inspector that is ready to make the move to a PA will also be considered. The right candidate should have experience managing one or more full-time inspectors, and should have most, if not all, of the below qualifications and certifications.Day-to-Day:

  • Monitoring project construction progress by supervising and receiving pay item data from inspection staff, then developing both monthly and final estimate payment packages.

  • Responsible for managing CEI projects and marketing upcoming CEI pursuits

  • Directs and assigns specific tasks to Administrative staff, Contract Support Specialists and Inspectors and assists in all phases of construction projects

  • Expected to participate in marketing and lead future CEI work pursuits for FDOT and local municipalities

  • Direct highly complex and specialized construction engineering administration and inspection program

  • Reviewing inspection Daily Work Reports, approving estimates, utilizing FDOT Site Manager and Materials Acceptance Certification systems, and writing monthly FDOT status reports

  • Managing construction contracts, responsible for taking ownership of the entire project completion process from planning and conducting the pre-construction conference to final acceptance


What you should bring:

  • 5 years plus of advanced CEI Construction and/or project management experience (preferred)

  • FDOT Intermediate or Advanced MOT Certification

  • CTQP Concrete Field Inspector Level I and 2

  • CTQP Asphalt Roadway Level I and 2

  • CTQP Earthwork Construction Inspection Level I and 2

  • CTQP Final Estimates Level 1 and 2

  • CTQP QC Manager


What We Offer:

  • Competitive Salary

  • Paid Time Off (Vacation, PTO & Holidays)

  • Education & Licensing Reimbursements

  • Life/AD&D Coverage

  • Unique & Casual Company Culture

  • 401k with Company Contribution

  • Medical, Dental & Vision Insurance

About Us:
Metric Engineering, Inc. was founded in 1976 on the principle of providing personalized consulting engineering services. Today, we are among the top consulting engineering firms specializing in civil and transportation projects. Over the last four decades, Metric has successfully completed numerous large, complex transportation projects in the United States and abroad. Our multi-disciplinary workforce and strategically located regional offices enable us to provide both maximized local responsiveness and a diversified technical base. Our clients include local, county, state and foreign governments, as well as private clients.

icon no score

See how you match
to the job

Find your dream job anywhere
with the LiveCareer app.
Mobile App Icon
Download the
LiveCareer app and find
your dream job anywhere
App Store Icon Google Play Icon
lc_ad

Boost your job search productivity with our
free Chrome Extension!

lc_apply_tool GET EXTENSION

Similar Jobs

Want to see jobs matched to your resume? Upload One Now! Remove
Senior CEI Inspector

Metric Engineering

Posted Yesterday

VIEW JOBS 11/26/2021 12:00:00 AM 2022-02-24T00:00 <div style="background: rgb(246, 246, 246); margin: 0px;"> <div style="margin: 0px 0px 0px 10.66px; line-height: 10.5pt;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><b><u><span style="margin: 0px;">CEI SENIOR INSPECTOR/SENIOR ENGINEER INTERN</span></u><span style="margin: 0px;"> </span></b><br /> <br /> <b>Role Overview:</b></span></span></div> <div style="margin: 12.46px 7.46px 0px 10.13px; text-align: justify; line-height: 90%; text-indent: 0.85pt;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 90%;">For CC2 bridge structures, </span><span style="margin: 0px; line-height: 90%;">be </span><span style="margin: 0px; line-height: 90%;">a </span><span style="margin: 0px; line-height: 90%;">high </span><span style="margin: 0px; line-height: 90%;">school graduate or equivalent and </span><span style="margin: 0px; line-height: 90%;">have </span><span style="margin: 0px; line-height: 90%;">five (5) years of general </span><span style="margin: 0px; line-height: 90%;">bridge </span><span style="margin: 0px; line-height: 90%;">construction experience of </span><span style="margin: 0px; line-height: 90%;">which </span><span style="margin: 0px; line-height: 90%;">two </span><span style="margin: 0px; line-height: 90%;">(2) </span><span style="margin: 0px; line-height: 90%;">years </span><span style="margin: 0px; line-height: 90%;">must have </span><span style="margin: 0px; line-height: 90%;">been </span><span style="margin: 0px; line-height: 90%;">with the type of CC2 bridge construction project for which </span><span style="margin: 0px; line-height: 90%;">CEI services are </span><span style="margin: 0px; line-height: 90%;">being provided by this </span><span style="margin: 0px; line-height: 90%;">scope. </span><span style="margin: 0px; line-height: 90%;">As an exception, only one (1) year of PTS bridge </span><span style="margin: 0px; line-height: 90%;">experience </span><span style="margin: 0px; line-height: 90%;">will be required. Additionally, a minimum of twelve (12) months of </span><span style="margin: 0px; line-height: 90%;">experience </span><span style="margin: 0px; line-height: 90%;">as the </span><span style="margin: 0px; line-height: 90%;">Senior </span><span style="margin: 0px; line-height: 90%;">Inspector in primary control of the type CC2 construction project for which </span><span style="margin: 0px; line-height: 90%;">CEI </span><span style="margin: 0px; line-height: 90%;">services are being provided </span><span style="margin: 0px; line-height: 90%;">by </span><span style="margin: 0px; line-height: 90%;">th</span><span style="margin: 0px; line-height: 90%;">i</span><span style="margin: 0px; line-height: 90%;">s scope. To be in primary control, a Senior Inspector must have supervised two or more inspectors and must have been directly responsible for all inspection requirements related to the construction operations assigned.</span></span></span></div> <ul> <li style="margin: 15.46px 7.33px 0px 33.73px; text-align: justify; line-height: 90%; text-indent: 0.2pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><u><span style="margin: 0px; line-height: 90%;">CPTS</span></u><span style="margin: 0px; line-height: 90%;"> </span><span style="margin: 0px; line-height: 90%;">years of </span><span style="margin: 0px; line-height: 90%;">experience </span><span style="margin: 0px; line-height: 90%;">must have included </span><span style="margin: 0px; line-height: 90%;">a </span><span style="margin: 0px; line-height: 90%;">minimum of twelve </span><span style="margin: 0px; line-height: 90%;">(</span><span style="margin: 0px; line-height: 90%;">12) months </span><span style="margin: 0px; line-height: 90%;">of </span><span style="margin: 0px; line-height: 90%;">inspection </span><span style="margin: 0px; line-height: 90%;">experience </span><span style="margin: 0px; line-height: 90%;">in one or both of the following depending on which area the inspector is being approved for: (I) casting yard inspection; (2) </span><span style="margin: 0px; line-height: 90%;">erection </span><span style="margin: 0px; line-height: 90%;">inspection. In addition, two (2) years of geometry-control </span><span style="margin: 0px; line-height: 90%;">surveying experience </span><span style="margin: 0px; line-height: 90%;">is required for inspectors that perform or monitor geometry </span><span style="margin: 0px; line-height: 90%;">control surveying </span><span style="margin: 0px; line-height: 90%;">in a </span><span style="margin: 0px; line-height: 90%;">casting </span><span style="margin: 0px; line-height: 90%;">yard.</span></span></span><br />  </li> <li style="margin: 0.13px 8.33px 0px 33.8px; text-align: justify; line-height: 91%; text-indent: -0.1pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><u><span style="margin: 0px; line-height: 91%;">CPTCB</span></u><span style="margin: 0px; line-height: 91%;"> </span><span style="margin: 0px; line-height: 91%;">years of </span><span style="margin: 0px; line-height: 91%;">experience </span><span style="margin: 0px; line-height: 91%;">must include monitoring and inspection </span><span style="margin: 0px; line-height: 91%;">of </span><span style="margin: 0px; line-height: 91%;">the following: girder </span><span style="margin: 0px; line-height: 91%;">erection, safe </span><span style="margin: 0px; line-height: 91%;">use of girder </span><span style="margin: 0px; line-height: 91%;">erection </span><span style="margin: 0px; line-height: 91%;">cranes, girder stabilization after </span><span style="margin: 0px; line-height: 91%;">erection, </span><span style="margin: 0px; line-height: 91%;">false work for temporary girder support, and PT and grouting operations.</span></span></span><br />  </li> <li style="margin: 0px 7.13px 0px 33.73px; text-align: justify; line-height: 90%; text-indent: -0.55pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 90%;">fI.S..years </span><span style="margin: 0px; line-height: 90%;">of </span><span style="margin: 0px; line-height: 90%;">experience </span><span style="margin: 0px; line-height: 90%;">must include monitoring of the following: installation of PT ducts </span><span style="margin: 0px; line-height: 90%;">and related </span><span style="margin: 0px; line-height: 90%;">hardware and post-tensioning and grouting of </span><span style="margin: 0px; line-height: 90%;">strands </span><span style="margin: 0px; line-height: 90%;">or be the level </span><span style="margin: 0px; line-height: 90%;">of experience </span><span style="margin: 0px; line-height: 90%;">that meets the </span><span style="margin: 0px; line-height: 90%;">criteria </span><span style="margin: 0px; line-height: 90%;">for </span><span style="margin: 0px; line-height: 90%;">CPTS </span><span style="margin: 0px; line-height: 90%;">or </span><span style="margin: 0px; line-height: 90%;">CPTCB </span><span style="margin: 0px; line-height: 90%;">bridges.</span></span></span><br />  </li> <li style="margin: 0.33px 6.93px 0px 33.73px; text-align: justify; line-height: 90%; text-indent: 0.7pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><u><span style="margin: 0px; line-height: 90%;">MB</span></u><span style="margin: 0px; line-height: 90%;"> years of experience must have included the inspection of MB mechanical </span><span style="margin: 0px; line-height: 90%;">components for </span><span style="margin: 0px; line-height: 90%;">machinery </span><span style="margin: 0px; line-height: 90%;">inspectors and </span><span style="margin: 0px; line-height: 90%;">MB </span><span style="margin: 0px; line-height: 90%;">electrical components/systems for electrical inspectors.</span></span></span><br />  </li> </ul> <div style="margin: 2.33px 16.8px 0px 10.33px; line-height: 24.3pt; text-indent: 0.7pt;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">Must have the following as required by the scope of work for the project:<br /> <u>QUALIFICATIONS</u>:</span></span></span></div> <ul> <li style="margin: 0px 0px 0px 10.33px; line-height: 9.35pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">CTQP Concrete Field Technician Level I</span></span></span></li> <li style="margin: 0.33px 198.86px 0px 10.6px; line-height: 91%;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 91%;">CTQP Concrete Field Inspector Level II (Bridges) CTQP Asphalt Roadway Level I</span></span></span></li> <li style="margin: 0px 16.8px 0px 10.6px; line-height: 91%;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 91%;">CTQP Asphalt Roadway Level II CTQP Earthwork Construction Inspection Level I CTQP Earthwork Construction </span><span style="margin: 0px; line-height: 91%;">Inspection </span><span style="margin: 0px; line-height: 91%;">Level II</span></span></span></li> <li style="margin: 0px 0px 0px 10.6px; line-height: 11.9pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">CTQP Pile Driving Inspection</span></span></span></li> <li style="margin: 0.4px 35.46px 0px 10.46px; text-align: justify; line-height: 90%; text-indent: 0.1pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 90%;">CTQP Drilled Shaft Inspection (required for inspection of all drilled shafts including miscellaneous structures such as sign structures, lighting structures, and traffic signal structures)</span></span></span></li> <li style="margin: 0px 0px 0px 10.6px; line-height: 12.05pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">CTQP Grouting Technician Level I</span></span></span></li> <li style="margin: 0.06px 250.8px 0px 11.6px; line-height: 92%; text-indent: -0.75pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 92%;">CTQP Post-Tensioning Technician Level I IMSA Traffic Signal Inspector Level I FDOT lntennediate MOT</span></span></span></li> <li style="margin: 0px 0px 0px 10.93px; line-height: 12.05pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">CTQP Final Estimates Level I</span></span></span></li> </ul> <div style="margin: 0.33px 0px 0px;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;"> </span></span></span></div> <div style="margin: 0px 0px 0px 10.93px; line-height: 12.6pt;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><u><span style="margin: 0px;">CERTIFICATIONS</span></u><span style="margin: 0px;">:</span></span></span></div> <ul> <li style="margin: 0px 0px 0px 11.73px; line-height: 12.25pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">Nuclear Radiation Safety</span></span></span></li> <li style="margin: 0px 0px 0px 12.06px; line-height: 12.85pt;" style="padding: 0; margin: 0;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">IMSA Traffic Signal Inspector Level I</span></span></span></li> </ul> <div style="margin: 0px;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"> </span></span></div> <div style="margin: 0px 0px 0px 12.8px; line-height: 12.8pt;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><u><span style="margin: 0px;">OTHER:</span></u></span></span></div> <div style="margin: 0px 8.06px 0px 14.06px; text-align: justify; line-height: 91%; text-indent: -0.85pt;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px; line-height: 91%;">Complete the Critical Structures Construction Issues, Self Study Course, and submit the mandatory Certification of Course Completion form (for structures<span style="margin: 0px; letter-spacing: 2.55pt;"> </span>projects).</span></span></span></div> <div style="margin: 0.46px 0px 0px;"><span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;"> </span></span></span></div> <span style="font-size:12px;"><span style="font-family:arial,helvetica,sans-serif;"><span style="margin: 0px;">Responsible </span><span style="margin: 0px;">for performing highly </span><span style="margin: 0px;">complex </span><span style="margin: 0px;">technical </span><span style="margin: 0px;">assignments </span><span style="margin: 0px;">in field </span><span style="margin: 0px;">surveying and construction </span><span style="margin: 0px;">layout, making, and checking </span><span style="margin: 0px;">engineering </span><span style="margin: 0px;">computations, inspecting </span><span style="margin: 0px;">construction </span><span style="margin: 0px;">work, and conducting field tests and is responsible for coordinating and managing the </span><span style="margin: 0px;">l</span><span style="margin: 0px;">ower level inspectors. Work is performed under the general supervision of the Project Administrator.</span><br /> <br /> <b><i>About Us: </i></b><br style="color: rgb(0, 0, 0); text-transform: none; text-indent: 0px; letter-spacing: normal; font-size: 13px; word-spacing: 0px; white-space: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255);" /> <br style="color: rgb(0, 0, 0); text-transform: none; text-indent: 0px; letter-spacing: normal; font-size: 13px; word-spacing: 0px; white-space: normal; orphans: 2; widows: 2; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255);" /> <span style="font-style: normal; font-variant-ligatures: normal; font-variant-caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: start; text-indent: 0px; text-transform: none; white-space: normal; widows: 2; word-spacing: 0px; -webkit-text-stroke-width: 0px; background-color: rgb(255, 255, 255); text-decoration-style: initial; text-decoration-color: initial; float: none; display: inline !important;">Metric Engineering, Inc. was founded in 1976 on the principle of providing personalized consulting engineering services. Today, we are among the top consulting engineering firms specializing in civil and transportation projects. In the last four decades, Metric has successfully completed numerous large, complex transportation projects in the United States and abroad. Our multi-disciplinary workforce and strategically located regional offices enable us to provide both maximized local responsiveness and a diversified technical base. Our clients include local, county, state and foreign governments as well as private clients.</span></span></span><br />  </div> <div style="background: rgb(246, 246, 246); margin: 0px 0px 0px 46px; line-height: 13.5pt;"> </div> Metric Engineering Orlando FL

ITS CEI Project Administrator

Metric Engineering